Programming Problems Parameterized Sub-Cycle Robots to Supply Parts and Tools Function within a Flexible Manufacturing Cell
Hits: 3154
- Research areas:
- Year:
- 2015
- Type of Publication:
- Article
- Keywords:
- Flexible Manufacturing Cell, Parametric Programming, Robot, Work Cycles
- Authors:
- Florin Timotei AVRAM; Macedon GANEA
- Journal:
- IJAIM
- Volume:
- 4
- Number:
- 3
- Pages:
- 103-106
- Month:
- November
- Abstract:
- In this paper we propose presenting the issues involved in the case of parametric programming in a flexible manufacturing cell. Flexible manufacturing cell is composed of a machining center, a warehouse type Regal, a conveyor and two robots. The parameterization will imply cycles of loading / unloading a warehouse type Regal, a conveyor and machining center to reduce learning time robot and for more flexibility of the manufacturing cell.
Full text:
IJAIM_493_Final.pdf
